Kajian Kapasitas Pompa sebagai Alternatif Solusi Pengendalian Aliran Balik di Kampung Glintung (GWS) Kota Malang

Zulbihar, Hendy Arifian Mifdar and Sedyowati, Laksni ORCID: https://orcid.org/0000-0001-9170-9864 (2022) Kajian Kapasitas Pompa sebagai Alternatif Solusi Pengendalian Aliran Balik di Kampung Glintung (GWS) Kota Malang. Composite: Journal Of Civil Engineering, 1 (2). pp. 51-61. ISSN 2964-6626 (P) ; 2961-7111 (E)

[thumbnail of 13. Kajian Kapasitas Pompa sebagai Alternatif Solusi Pengendalian Aliran Balik di Kampung Glintung (GWS) Kota Malang. _ Zulbihar _ Composite_ Journal of Civil Engineering.pdf]
Preview
Text
13. Kajian Kapasitas Pompa sebagai Alternatif Solusi Pengendalian Aliran Balik di Kampung Glintung (GWS) Kota Malang. _ Zulbihar _ Composite_ Journal of Civil Engineering.pdf

Download (3MB) | Preview
[thumbnail of 13. Turnitin_Kajian Kapasitas Pompa sebagai Alternatif Solusi Pengendalian Aliran Balik di Kampung Glintung (GWS) Kota Malang (1).pdf]
Preview
Text
13. Turnitin_Kajian Kapasitas Pompa sebagai Alternatif Solusi Pengendalian Aliran Balik di Kampung Glintung (GWS) Kota Malang (1).pdf

Download (3MB) | Preview

Abstract

The phenomenon of flooding that occurred in Glintung Village (GWS), especially those that occurred in RT 01, RT 02 and RT 03, is a phenomenon that is rarely found in other areas. Usually, floods occur due to high rainfall intensity, causing excess water which cannot be accommodated by waterways, to overflow into floods. The floods in the GWS indicate a backflow phenomenon which causes water that should flow into the river to turn around and overflow into residents' settlements. To anticipate floods due to backflow which have a bigger impact, one effort that can be done to solve this problem is to install pumps to reduce the volume of flooding in the area. So an analysis is needed to determine the required pump capacity to reduce the flood volume. The results of the analysis show that reducing the volume of flooding can be done by installing 3 pumping stations and 3 pumps with a capacity of 100 m3/hour for RT 03, 3 pumps with a capacity of 50 m3/hour, for RT 02 and 1 pump with a capacity of 50 m3 /hour for RT 01. In addition, it is also necessary to install a backflow valve and repair the existing river retaining wall.

Item Type: Article
Additional Information: Laksni Sedyowati NIDN: 0712026701
Uncontrolled Keywords: Flood, Backflow, Pump Station, Pump
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering
T Technology > TJ Mechanical engineering and machinery
Divisions: Fakultas Teknik > S1 Teknik Sipil
Depositing User: Rita Juliani
Date Deposited: 12 Dec 2023 05:27
Last Modified: 12 Dec 2023 05:27
URI: https://eprints.unmer.ac.id/id/eprint/3883