Firmanto, Anas (2024) Penerapan Csp (Corrugated Steel Plate) Pada Proyek Jalan Tol Binjai – Pangkalan Brandan. Undergraduate thesis, Fakultas Teknik Sipil Universitas Merdeka Malang.
Preview |
Text
HALAMAN AWAL.pdf Download (869kB) | Preview |
Preview |
Text
BAB I.pdf Download (362kB) | Preview |
![]() |
Text
BAB II.pdf Restricted to Repository staff only Download (2MB) |
![]() |
Text
BAB III.pdf Restricted to Repository staff only Download (1MB) |
![]() |
Text
BAB IV.pdf Restricted to Repository staff only Download (1MB) |
![]() |
Text
BAB V.pdf Restricted to Repository staff only Download (280kB) |
Preview |
Text
DAFTAR PUSTAKA.pdf Download (277kB) | Preview |
Preview |
Text
PLAGIASI ANAS FIRMATO.pdf Download (2MB) | Preview |
Abstract
The Binjai – Pangkalan Brandan (Binbran) Toll Road is one of the plans for the Trans Sumatra Road section that connects Binjai City, Deli Serdang Regency and Langkat Regency.
This toll road is planned to be built on piles with a relatively high elevation, namely 3 meters to 7 meters At Grade and Elevated (Pile slab, Underpass, Box Underpass) at STA (Station) 0+000 to STA 58+000 as well as several locations with Conventional Box Underpass (BUP) Cast in Situ (CIS) structures at the intersection of plantation, village and district roads. Currently, the Main Road Toll intersection is an access road with high traffic flow for the community, PTPN II – III Plantation vehicles, Palm Oil Companies (PKS) as transportation for sugar cane and palm oil harvests and their distribution. By considering all the variables that influence the determination of changes to the scope of work, one way to assist decision making is the Analytical Hierarchy Process (AHP). This method has the ability to develop a priority scale (as a weight factor) from complex variables and is easy to apply. Data collection was carried out using Forum Group Discussion (FGD) and questionnaires with respondents who were competent in the Decision to Change the Scope of New Pay Items in the Binjai Brandan Project. The conventional Box Underpass (BUP) Cast in Situ (CIS) structure which was later switched to Corrugated Steel Plate (CSP) greatly influenced the achievement of project objectives, namely cost, time, quality and social and environmental impacts. It is hoped that changes in the Scope of Application of Corrugated Steel Plate (CSP), the complexity of the work on the project and the suitability between the availability of resources and the problems expected to occur on the project can be overcome. And one of the value engineering processes (analyzing the function of an item/system with the aim of achieving the required function at the lowest possible cost without sacrificing the quality, function, aesthetics of the initial building) in the project so that the project obj
Item Type: | Thesis (Undergraduate) |
---|---|
Additional Information: | Anas Firmanto NIM: 21041000074 |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TH Building construction |
Divisions: | Fakultas Teknik > S1 Teknik Sipil |
Depositing User: | fufu Fudllah Wahyudiyah |
Date Deposited: | 15 Feb 2025 11:28 |
Last Modified: | 15 Feb 2025 11:30 |
URI: | https://eprints.unmer.ac.id/id/eprint/4316 |
Actions (login required)
![]() |
View Item |