Search for collections on University of Merdeka Malang Repository

Analisis Perbedaan Waktu Dan Biaya Terhadap Bekisting Kolom Balok Dan Pelat Lantai Konvensional Dan Sistem Knock Down Pada Proyek Pembangunan Gedung Tower Ta’miriyah Kota Surabaya

Downloads

Downloads per month over past year

Atmaja, Tamalaqhy Diga Budi (2024) Analisis Perbedaan Waktu Dan Biaya Terhadap Bekisting Kolom Balok Dan Pelat Lantai Konvensional Dan Sistem Knock Down Pada Proyek Pembangunan Gedung Tower Ta’miriyah Kota Surabaya. Undergraduate thesis, Fakultas Teknik Universitas Merdeka Malang.

[thumbnail of HALAMAN AWAL.pdf]
Preview
Text
HALAMAN AWAL.pdf

Download (5MB) | Preview
[thumbnail of BAB 1.pdf]
Preview
Text
BAB 1.pdf

Download (1MB) | Preview
[thumbnail of BAB 2.pdf] Text
BAB 2.pdf
Restricted to Repository staff only

Download (1MB)
[thumbnail of BAB 3.pdf] Text
BAB 3.pdf
Restricted to Repository staff only

Download (2MB)
[thumbnail of BAB 4.pdf] Text
BAB 4.pdf
Restricted to Repository staff only

Download (11MB)
[thumbnail of BAB 5.pdf] Text
BAB 5.pdf
Restricted to Repository staff only

Download (712kB)
[thumbnail of DAFTAR PUSTAKA.pdf]
Preview
Text
DAFTAR PUSTAKA.pdf

Download (268kB) | Preview
[thumbnail of HASIL CEK PLAGIASI.pdf]
Preview
Text
HASIL CEK PLAGIASI.pdf

Download (217kB) | Preview

Abstract

The demand for formwork for concrete structural works has led to the development of various systems, using different types of materials and equipment. Generally, the conventional formwork installation system uses wooden materials that can be disassembled and reassembled in a different form, but this means that the original components have a short life and are easily damaged over time. While the Knock down formwork system has a repetitive service life, it is more expensive at the beginning of use. If the need for mold materials increases, the cost of the mold is also higher, but the processing time can be done quickly. Determination of the formwork work zone to consider the time and cost efficiency of the formwork installation. The analysis results show that the use of the knock down formwork system is more efficient by only taking 83 days while the cost is IDR 7,203,522,966.67.

Item Type: Thesis (Undergraduate)
Additional Information: Tamalaqhy Diga Budi Atmaja NIM : 20041000099
Uncontrolled Keywords: Knock down Formwork, Conventional Formwork, Cost, Time, Zone.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > S1 Teknik Sipil
Depositing User: nata Natassa Auditasi
Date Deposited: 25 Jun 2025 07:16
Last Modified: 26 Jun 2025 03:49
URI: https://eprints.unmer.ac.id/id/eprint/5380

Actions (login required)

View Item View Item