Search for collections on University of Merdeka Malang Repository

Analisa Pekerjaan Galian Timbunan Pemadatan Base Course Lapisan Tanah dan Estimasi Biaya Proyek Jalan Lintas Selatan Lot 7 Tambak Rejo-Serang, Blitar

Uak, Mariana Triganda Benga Eko (2024) Analisa Pekerjaan Galian Timbunan Pemadatan Base Course Lapisan Tanah dan Estimasi Biaya Proyek Jalan Lintas Selatan Lot 7 Tambak Rejo-Serang, Blitar. Undergraduate thesis, Fakultas Teknik Universitas Merdeka Malang.

[thumbnail of HALAMAN AWAL.pdf]
Preview
Text
HALAMAN AWAL.pdf

Download (5MB) | Preview
[thumbnail of BAB I.pdf]
Preview
Text
BAB I.pdf

Download (201kB) | Preview
[thumbnail of BAB II.pdf] Text
BAB II.pdf
Restricted to Repository staff only

Download (991kB)
[thumbnail of BAB III.pdf] Text
BAB III.pdf
Restricted to Repository staff only

Download (550kB)
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Repository staff only

Download (3MB)
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Repository staff only

Download (109kB)
[thumbnail of DAFTAR PUSTAKA.pdf]
Preview
Text
DAFTAR PUSTAKA.pdf

Download (188kB) | Preview
[thumbnail of HASIL CEK PLAGIASI.pdf]
Preview
Text
HASIL CEK PLAGIASI.pdf

Download (592kB) | Preview

Abstract

The Southern Cross Line (SCL) is a project located in Blitar district which aims to connect Tambakrejo beach with Serang beach with a travel time that is usually 2-3hours, now it is less than 30 minutes.
The implementation of the work to build the southern traffic lane is dominated by heavy equipment with rocky and muddy soil characteristics and needs to be trimmed along 12 km. So the selection and determination of heavy equipment must be considered in order to operate effectively.
This study uses the theory of heavy equipment productivity, determining the type and number of tools according to the terrain, the type of soil to be excavated, and the compacted. The amount of heavy equipment used will determine the optimalwork time. Heavy equipment working hours use normal hours, which is 8hours/day, the calculation method is used by trial and error, from this method, the calculation of heavy equipment production by taking calculations alternative/assumption. The results of the alternative calculation/assumption were obtained as many as 7 units of Pc 300 excavators, 15 units of bulldozers, 3 units ofroller vibrators, and 22 units of dump trucks with a work time of 27 days or with 216 hours along 12 km, so that the work is faster than the work in the field. The total calculation of the stockpile from sta 0+000 to sta 2+000 obtained a total volume of43435.3776 m3. The total calculation of excavations from 0+000 to sta 2+000 obtained a volume of 24932.82285 m3. The estimated cost of excavation of the landfill is Rp. 9,384,446,102.67.

Item Type: Thesis (Undergraduate)
Additional Information: Mariana Triganda Benga Eko Uak NIM : 17041000058
Uncontrolled Keywords: Calculation of Pile Excavation, Heavy Equipment Productivity, Number of Heavy Equipment, Working Time of Equipment Estimated Cost of Pileexcavation
Subjects: T Technology > TE Highway engineering. Roads and pavements
Divisions: Fakultas Teknik > S1 Teknik Sipil
Depositing User: Gendhis Dwi Aprilia
Date Deposited: 26 May 2025 08:19
Last Modified: 26 May 2025 08:19
URI: https://eprints.unmer.ac.id/id/eprint/5297