Optimalisasi Waktu Dan Biaya Pekerjaan Bekisting Untuk Gedung Bertingkat Dengan Sistem Zoning Proyek Gedung Universitas Katolik Dharma Cendika Surabaya

Hadi, Kusuma (2024) Optimalisasi Waktu Dan Biaya Pekerjaan Bekisting Untuk Gedung Bertingkat Dengan Sistem Zoning Proyek Gedung Universitas Katolik Dharma Cendika Surabaya. Undergraduate thesis, Fakultas Teknik Universitas Merdeka Malang.

[thumbnail of HALAMAN AWAL.pdf] Text
HALAMAN AWAL.pdf

Download (1MB)
[thumbnail of BAB 1.pdf] Text
BAB 1.pdf

Download (166kB)
[thumbnail of 12 BAB 2.pdf] Text
12 BAB 2.pdf
Restricted to Repository staff only

Download (229kB)
[thumbnail of BAB 3.pdf] Text
BAB 3.pdf
Restricted to Repository staff only

Download (1MB)
[thumbnail of BAB 4.pdf] Text
BAB 4.pdf
Restricted to Repository staff only

Download (723kB)
[thumbnail of BAB 5.pdf] Text
BAB 5.pdf
Restricted to Repository staff only

Download (18kB)
[thumbnail of DAFTAR PUSTAKA.pdf] Text
DAFTAR PUSTAKA.pdf

Download (18kB)
[thumbnail of SK PLAGIASI.pdf] Text
SK PLAGIASI.pdf

Download (1MB)

Abstract

At High rise Building which have shape structure usually tipically every floor have more effectiveness to replace the formwork every floor. On preparing to doing activities construction.needed extra considering for method and system more effective and economy. On formwork activities at mega project usually more effisien because the formwork can used again after pouring concrete work.
Because of installing formwork,fabrication,and uninstall formwork caused waste material on this means is wood and multiplex which can’t used again for next formwork. Purpose this research are determinate optimalization in every divide
zone work area also know cost and duration who neede on every segmen of work used zoning method.
The method which used in this research use observation to time and cost formwork.there are 2 data it is.primary data and secondary data. On research collect data with arrange instrumen research. According research .analysis and counting could take conclusion that forwarding every floor using zoning system can take 2 days earlier than before
and cost of all item is IDR.642.615.171,75 more economys than method earlier

Item Type: Thesis (Undergraduate)
Additional Information: Kusuma Hadi NIM: 15041000112
Uncontrolled Keywords: Formworks, Zoning System, Optimalization Cost and Time
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Divisions: Fakultas Teknik > S1 Teknik Sipil
Depositing User: fufu Fudllah Wahyudiyah
Date Deposited: 27 Feb 2025 04:31
Last Modified: 27 Feb 2025 04:31
URI: https://eprints.unmer.ac.id/id/eprint/4395

Actions (login required)

View Item View Item