Ardysyahputra, Faiz (2024) Perencanaan Manajemen Proyek Pekerjaan Pembangunan Outlet Box Culvert Dan Runway Strip Di Bandar Udara Rendani Manokwari Papua Barat. Undergraduate thesis, Fakultas Teknik Sipil Universitas Merdeka Malang.
Preview |
Text
HALAMAN AWAL.pdf Download (639kB) | Preview |
Preview |
Text
BAB I PENDAHULUAN (1).pdf Download (4MB) | Preview |
![]() |
Text
BAB II KAJIAN PUSTAKA.pdf Restricted to Repository staff only Download (4MB) |
![]() |
Text
BAB III METODE PENELITIAN.pdf Restricted to Repository staff only Download (4MB) |
![]() |
Text
BAB IV HASIL DAN PEMBAHASAN.pdf Restricted to Repository staff only Download (5MB) |
![]() |
Text
BAB V KESIMPULAN DAN SARAN.pdf Restricted to Repository staff only Download (4MB) |
Preview |
Text
DAFTAR PUSAKA.pdf Download (3MB) | Preview |
Preview |
Text
HASIL CEK PLAGIASI.pdf Download (644kB) | Preview |
Abstract
Rendani Manokwari Airport is one of the airports located in the provincial capital area, precisely in Manokwari Regency, West Papua Province, has a trategic role in supporting efforts to increase the role of air transportation in relation to regional development in particular and national development in general.
Currently Rendani Manokwari Airport is carrying out an Airport Development Work Project which includes box culvert work, runway strip widening, and runway extension. Due to the work of extending the runway at Rendani Airport there is a river that runs from upstream to downstream, so to be able to do this runway extension work is overcome by box culvert work with a width of 14.5 m, a height of 5.5 m, and a length of 350 m to meet the runway strip in accordance with
regulations with the largest aircraft B737-900 ER.
So to meet the runway strip 140 in accordance with flight regulations, further work planning is carried out to make box culvert outlets and runway strips to maximize the existing shortage of work to meet runway strip 140.
For this time analysis, the author uses the S curve method using Ms. Project and Network Planning CPM and calculates the costs required for this work. The time required for this work is 196 days or the same as 32 weeks with a planned
budget of Rp. 18,781,846,800.00
Item Type: | Thesis (Undergraduate) |
---|---|
Additional Information: | Faiz Ardysyahputra NIM: 20041000134 |
Uncontrolled Keywords: | Outlet, Box Culvert, Runway Strip, Kurva S, Ms. Project |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TH Building construction |
Divisions: | Fakultas Teknik > S1 Teknik Sipil |
Depositing User: | fufu Fudllah Wahyudiyah |
Date Deposited: | 16 Feb 2025 09:25 |
Last Modified: | 16 Feb 2025 09:25 |
URI: | https://eprints.unmer.ac.id/id/eprint/4368 |
Actions (login required)
![]() |
View Item |